Princeton Weekly Bulletin   April 28, 2008, Vol. 97, No. 25   prev   next   current

A look at chemistry building’s future

Rendering of the north and west views of the completed chemistry building (Courtesy of Hopkins Architects)

Princeton NJ — As work on the new chemistry building south of Jadwin Hall proceeds, a mock-up representing proposed facades for the building has been erected for reference at the construction site. The 17-foot-high structure is composed of granite panels, which will be used primarily on the north and south facades; aluminum framing carrying high-performance glazing; and cast aluminum sunscreens that will shade the windows.

A mock-up of proposed facades (photo: Denise Applewhite)

Work currently is progressing on the building’s concrete foundations and basement walls. Concrete structural work will continue through the spring, to be followed by structural steel framing later this year. This rendering depicts north and west views of the completed chemistry building, which is being designed by Hopkins Architects of London in collaboration with Payette Associates of Boston and is due to open in fall 2010.

 
    
  • PWB new logo
  • Submit items for future calendars by using the calendar submission form link on the PWB home page.
  • The Bulletin is published weekly during the academic year, except during University breaks and exam weeks, by the Office of Communications. Second class postage paid at Princeton. Postmaster: Send address changes to Princeton Weekly Bulletin, Office of Communications, Princeton University, 22 Chambers St., Suite 201, Princeton, NJ 08542. Permission is given to adapt, reprint or excerpt material from the Bulletin for use in other media.
  • Subscriptions. The Bulletin is distributed free to faculty, staff and students. Others may subscribe to the Bulletin for $30 for the 2007-08 academic year ($18 for current Princeton parents and people over 65). Send a check to Office of Communications, Princeton University, 22 Chambers St., Suite 201, Princeton, NJ 08542.
  • Deadlines. In general, the copy deadline for each issue is the Friday 10 days in advance of the Monday cover date. The deadline for the Bulletin that covers May 19-June 1 is Friday, May 9. A complete publication schedule is available at www.princeton.edu/ pr/ pwb/ deadlines.html; or by calling (609) 258-3601.
  • Managing editor: Eric Quiñones
  • Assistant editor: Jennifer Greenstein Altmann
  • Calendar editor: Shani Hilton
  • Contributing writers: Karin Dienst, Kitta MacPherson
  • Photographer: Denise Applewhite
  • Design: Maggie Westergaard
  • Web edition: Mahlon Lovett
  • Subscription manager: Elizabeth Patten
  • PU shield